Programmes
EPISODE 9:
Mark paints & sets the timing on his newly assembled engine.
Meanwhile, Alan King shows his class 1 Range Rover Special, which
is extensively modified. Featuring hydraulic steering amongst its
many modifications, it can do some serious offroading. Back in the
workshop, Mark fits his core plugs, before venturing to his bench
to show how to correctly remove a broken stud. Attention is then
turned to rebuilding the oil pump.
Out of the workshop, Mark looks at a unique Range Rover, and then
unites the newly fitted Clutch and gearbox to the engine. Mark then
takes the strain as he fits the rebuilt running gear into the awaiting
chassis.
|

|